Go to: Portal of the Defense DepartmentGo to: Page of beginning
Go to: Page of beginning
Banner of head-board of interior pages Modernization
castellano english français
Buscador:
Buscador Armada

Home  >  Get to know us  >  Modernization  >  Submarine S-80

CONTENIDO PRINCIPAL DE LA PÁGINA

Background

BACKGROUND

The Strategic Defence Review issued in February 2003, considered the S-80 Submarine a priority programme. This document takes into account the need to procure submarine units to maintain the freedom of action and mobility of the Force with two submarines operating simultaneously in two theatres: one in a far away scenario and another close by. The units will have an air independent propulsion system with land-attack missile capability and important elements for intelligence gathering.

Preliminary studies were carried out between 1989 and 1991. In the year 1997 the programme started following the PAPS method. (Phased Armaments Programming System):

  • Assessment of operational requirements resulting in the document “Preliminary Concept of Staff Objectives” published in November 1997.
  • Pre-feasibility stage resulting in the document “Staff Objectives” published in April 1998.
  • Feasibility stage resulting in the document “Staff Requirements”.
  • Project Definition (First Stage): On November 2nd 1999 a contract was signed between IZAR Shipyards in Cartagena and DAM for the definition of a submarine prototype.

Changes in the world strategic situation recommended a review of operational requirements to adapt the submarine to new scenarios and demands. New “Staff Requirements” were approved by the Spanish Chief of Naval Staff in July 2002.

The main changes included the air independent propulsion system (AIP) and land-attack capability.

  • Project Definition (Second Stage): In order to implement the new requirements a new contract was signed with IZAR in November 2002.

In March 2004 the Shipbuilding Order was signed between the Ministry of Defence/Spanish Navy and IZAR to build four S-80 Submarines. The main milestones are:

  • January 2005:              Shipbuilding starts.
  • October 2011:             Delivery of the first submarine.
  • 2012/2014:                 The whole series is completed.
| Imprimir Documento